Faber Headquarters
Between mathematics and abstraction
The project stems from the need
to bring together the company’s headquarters,
spread across several locations, in a building
set at the edge between the industrial area
and the agricultural landscape, establishing
a relationship with its surroundings.

The building consists of two offset longitudinal volumes, connected by a central body that hosts
a double-height hall.
This configuration generates two internal courtyards, oriented towards different landscapes: to the east, the Julian Alps along the border; to the west, the Friulian plain, partly paved and accessible from the auditorium.


The cross-section contains the project’s most conceptual aspect. Two “S” shapes, arranged over two and three levels, alternate views towards the internal courtyards and the surrounding landscapes — agricultural, industrial and mountainous — creating interiors that are always different. The space is organised around its functions, offers flexibility
to the workplaces and frames, from every point,
unexpected views and perspectives.
A single detail defines the entire building: a two-centimetre gap between every element composing the façade, the corners and the ground connections. A single module, made
of precast concrete and glass, represents the office unit and shapes the entire office space planning. Glass and concrete are the essential elements of the project, declined in multiple variations of surface, opacity, colour and reflection.
The character of the building is industrial, yet the architecture becomes abstract. The application of rigorous geometric rules,
and at the same time endlessly variable in plan, elevation and especially in section, becomes the key to reading the project.
Credits
Publications